Skip to main content

MRO marketing that gets your Part 145 shop on the shortlist.

Show your Part 145 scope and airframe fit at the top of the page, before ops opens another hangar's tab.

What a fleet manager checks before sending a work packageFleet managers · 60 seconds
  1. 01Approvals at the top of the pagePart 145 scope and ratings written on the page, out of the PDF.
  2. 02Airframes an ops manager can confirmType, inspection interval and base listed together.
  3. 03A direct line to the hangarSeparate AOG and work-package enquiries, in place of one shared inbox.
  4. 04A published response windowAn operator can tell whether you respond in hours or days before they call.

What the work has to prove

The work package is decided at the top of the page.

A fleet manager checks the approval, the airframe fit and the way into the hangar desk. Those three have to be on the page. A capabilities PDF does not make the list.

Who you are dealing with
Role
MRO marketing agencySearch, technical content, websites and narrowly targeted paid ads.
Part 145
At the top of the pageApproval family and airframe ratings, written the way ops reads them.
AOG desk
Routed firstThe form asks how urgent the job is and skips the shared inbox.
Certified?
NoWe are not a Part 145 organisation. We write for the shops that are.
Proposal
Written firstScope, timeline and terms on paper before you sign.
Results
Shared in your proposalComparable engagement detail comes with the written proposal.
yourshop.com/capabilities/part-145-citation
Hangar desk

Part 145 maintenance for Citation and King Air approvals, airframe ratings and AOG response in one place.

  • Part 145 FAA
  • Citation Sovereign
  • King Air 350
  • AOG desk
Request work packageAOG deskCapability review

What we put at the top of a Part 145 capability page: approvals, airframes and a direct way to reach the hangar.

Maintenance technicians working on an aircraft in a hangar

Three things that change

The problems we solve for MRO teams.

A fleet manager shortlists a hangar in about a minute. If your Part 145 scope, your airframes and a way to reach the hangar are not obvious, they open the next tab.

  1. 01

    Make the shortlist for the right work packages

    You hold the Part 145 approvals and the airframe ratings. A fleet manager placing a Citation or King Air cannot find them in sixty seconds, because they sit in PDFs no ops team downloads before shortlisting.

    What changes

    Approvals, airframes and AOG response are clear enough that ops and the CAMO keep you in the bid.

  2. 02

    Be found by airframe and inspection interval

    King Air phase checks and Citation hot sections bring you almost no search traffic, because your capability pages are not written around what ops types before building a shortlist.

    What changes

    You have a page for the low-volume, high-value searches that name a type, an interval, a base and an approval.

  3. 03

    Get ops from your capability list to the hangar

    The detail that wins a work package is in a brochure or comes out on a call. It is missing from the page ops uses to build the shortlist, and the only way in is one general contact form.

    What changes

    AOG, work-package and capability enquiries each have their own form and reach the right person in the hangar.

The short version

Who sends the work package, and what they check first.

MRO marketing is business-to-business selling that rests on credentials. Flight departments, charter operators and fleet managers judge a provider on its capability list, airframe ratings and OEM authorisations, then on turnaround history and regulatory standing (Part 145 under FAA, EASA/CAA and CASA; CAR 573 under TCCA). What wins the enquiry:

  • Airframe capability pages named for the types your Part 145 certificate lists
  • Part 145 / CAR 573 documentation placed where procurement looks for it
  • AOG-response content for the searches that cannot wait
  • SEO for specific searches: aircraft type, inspection interval and base location
  1. Fleet / flight departmentPart 145 and airframe rating before a call about the work package
  2. CAMO / continuing airworthinessCapability by type and interval, in more detail than a brochure list
  3. Airline / regional opsHeavy-check capability and base before a site visit
  4. Business-aviation owner opsAOG response window published on the page
  5. Aftermarket / OEM supportEngine or component shop authorisation on a page they can shortlist from
Aircraft maintenance hangar floor with tooling and airframe access
On the hangar floor

Two buyer paths

Two ways buyers start.

AOG / urgent ops

AOG calls go to the hangar, past the shared inbox.

  1. AOG enquiry
  2. Hangar desk
  3. Work package

A published response window and an RFQ form that sends urgent work straight to the hangar, where the quote is decided.

Start with AOG

Scheduled / heavy check

A page for each airframe and inspection interval.

  1. Capability review
  2. Airframe fit
  3. Work package

Pages written by aircraft type, inspection interval and base, so a fleet manager finds you before the shortlist closes.

Start with scheduled work

Next step

Want your website to help win more scheduled work and urgent AOG enquiries?

We will map the search, credibility, and scoping gaps holding back better maintenance opportunities.

  1. 01
    Send us the details
    Your approvals, your airframes and the page you most want fixed.
  2. 02
    Scoping call
    What the hangar takes on, how AOG calls are handled, and who shortlists you.
  3. 03
    Written proposal
    Scope, timeline and terms, in writing before you sign.

Related pages

MRO marketing for Part 145 shops: approvals, airframe ratings and AOG response where fleet managers shortlist.

FAQ

What MRO teams usually ask us.

Answers for Part 145 shops on scope, AOG enquiries and the written proposal.

An MRO website should prove your approvals, aircraft types, capabilities and turnaround fit, and give operators an obvious next step. An operator comparing maintenance providers checks approval status (Part 145, EASA 145, CASA Part 145), aircraft type coverage and turnaround within the first sixty seconds. If that sits in PDFs or behind generic capability statements, the work goes to a shop that shows it clearly.

Yes. Search is often where technical research starts, even when the final decision is made through proposals, facility visits and relationships. Operators and fleet managers search for terms like "King Air 350 maintenance [region]", "Part 145 repair station [capability]" and "[aircraft type] heavy check provider". Showing up for those searches gets you considered before the operator has shortlisted three providers and asked for proposals. MRO SEO brings few leads, but each one is worth a great deal.

Selling to MRO companies starts with capability evidence a fleet manager can verify in sixty seconds: Part 145 scope, airframe ratings, OEM authorisations and AOG response windows, published as web pages and not as PDFs. Add a page for each airframe and inspection interval, so buyers researching a heavy check find you before the shortlist closes.

It depends on urgency and how crowded your market is. SEO is the main channel for MROs, because maintenance decisions are slow and research-heavy. Paid search works for urgent AOG (Aircraft on Ground) demand, for promoting new capabilities or approvals, and for reaching operators in specific regions. A typical MRO programme puts seventy to eighty percent of budget into SEO and content, and the rest into paid campaigns for high-value service lines or new regions.

Retainers run $1,500–$8,500 USD/month, with ad spend separate. You start on a 3, 6 or 12-month term, then go month-to-month. Scope follows how maintenance buyers search: capability and approval pages first, then airframe-specific content and AOG response pages. Competitive Part 145 search terms typically move over four to eight months, so the written proposal sets expectations month by month before you commit.

The team is aviation-only. Every contributor has an aviation background, and the founder is a commercial pilot and former flight school general manager. Capability pages are written from your Part 145, EASA 145, CASA Part 145 or CAR 573 approval scope and airframe ratings, then checked against your approval documents. A fleet manager reading the page sees exactly what your certificate says.